This multi-phase, 17-month expansion project was performed in an operational hospital. Acousti’s hospital construction services included installing 20,000 sf of moisture mitigation systems, 12,000 sy of heat welded sheet vinyl, 20,000 sf of specialty floor tile, and more than 100,000 sf of specialty and acoustical ceiling tile. Acousti’s familiarity with AHCA inspection requirements and infection control procedures as well as our stringent quality control during construction were key to the overall project’s success and timeliness.
Baptist West Hospital Expansion
Branch
Pensacola
Location
Pensacola, FL
Size
100,000 sf
EXPLORE OUR PROJECTS